EDS: Clients who used the story slugged BC-CNS-Cloudy Outlook, which moved Feb. 12 under a WASHINGTON dateline, are asked to use the following correction. A corrected version of the story has been posted here.
WASHINGTON – A Feb. 12 story on solar-industry jobs incorrectly reported the capacity of utility-scale solar projects built in Arizona in 2014. Ryan Edge of the Solar Electric Power Association said the four plants built in the state last year had a capacity of 82 megawatts.